Dickies SA2001 GO/RT 3279  Hooded Sweatshirt
SA2001

Dickies SA2001 GO/RT 3279 Hooded Sweatshirt

£34.20
(previous price)
£24.95 Ex. VAT
£29.94 Inc. VAT

Dickies SA2002 GO/RT 3279 Hooded Sweatshirt. Conforms to Level 2 GO/RT 3279:2008. Note: The wearing of hoods line-side. Please see the attached Network Rail Safety Bulletin regarding the wearing of hoods line-side ...

+ Read More
/5.0
Leave Review

Colour

Size

Qty

In stock - 24hr to 48hr delivery UK mainland.

Dickies SA2002 GO/RT 3279 Hooded Sweatshirt.

Conforms to Level 2 GO/RT 3279:2008.
Note: The wearing of hoods line-side.
Please see the attached Network Rail Safety Bulletin regarding the wearing of hoods line-side or on or near the line.
Hoods must not be used in these locations.

EN471 Class 3 level 2.

A traditional hooded top in a 280gsm polyester sweat fabric.
Drawstring hood.

Thick contrast rib hem and cuffs.

Sizes range from Small to 4XL.

Ideal for those cool days an nights on the tracks.

Technical Standards

Fabric

  • Certified for use on the rail.
  • Drawstring hooded top.
  • Kangaroo pocket.

Product Data Sheet

Items ordered will be delivered as soon as possible - we need the space in the warehouse.

All delivery charges shown are for a next working day delivery of items in stock, to U.K. mainland only if ordered before 12.00 noon (excluding Highlands and Islands which is generally between 2 and 10 working days).

Charges for all next day mainland UK deliveries are £5.00 + the dreaded VAT.

However, if you are really generous then we ship all goods with a total value of more than £100 net of VAT absolutely free.

Charges for different delivery services (Saturday delivery, overseas locations etc.) can by obtained at checkout or by contacting Granite Workwear directly - click on the 'Contact Us' button to send an email or 'phone UK: 01159640111.

All delivery conditions and charges are subject to change without prior notice (we have to say this bit, but nothing has changed since Adam was a lad). Every effort is made to ensure that delivery is made within the estimated time scales and within a maximum of 3 working days.

All goods are subject to availability - again, we have to say this but we actually have on average 95% of the goods in stock at any one time.

We do our best to ensure that you get a top quality service - we want you to keep ordering from us!

In the event that we are unable to supply your goods within 28 days, we will inform you immediately and advise you of the expected delivery date.